Our site has 7 Mount St. Helens hikes: the Monitor Ridge summit climb, Ape Cave, Ape Canyon, the Harmony Trail, the Plains of Abraham and Coldwater Lake inside the national volcanic monument, plus Lewis River Falls on Forest Road 90 east of Cougar.
The Forest Service splits the monument into west, south and east sides, each on its own road, so the sections below explain which side to drive to, then cover SR 504 and Johnston Ridge, climbing permits and Ape Cave rules.
Updated October 2026
Quick picks
- Best summit: Mount St. Helens via Monitor Ridge: the standard route to the 8,365-foot crater rim, with a permit and a 7 to 12 hour day.
- Best for kids: Ape Cave: the lower cave runs about 0.75 mile each way on a sandy floor. For a lava tube with ice in it, see Guler Ice Cave west of Trout Lake.
- Best waterfall: Lewis River Falls: Lower Falls is 43 feet high and about 200 feet wide, steps from the parking area.
- Best volcano views without a permit: Ape Canyon: old growth, a narrow canyon rim and open pumice plains.
- Best lake: Harmony Trail: a short, steep drop to Spirit Lake and its floating log mat.
- Best with dogs: Lewis River Falls: the only hike on this page that allows leashed dogs.
Advertisement
South side: Cougar, FR 83 and FR 90
Of the 7 hikes, 4 start on the south side, reached from I-5 at Woodland on SR 503 through Cougar. From Cougar, the road east (SR 503 Spur, then FR 90) reaches FR 83 in 6.4 miles; FR 83 is a 9-mile paved road to Ape Cave, Climbers Bivouac and Ape Canyon, and FR 90 continues east to Lewis River Falls.
Mount St. Helens via Monitor Ridge
Photo: Mount St. Helens lava dome panorama, July 2014 by Moxfyre, CC BY-SA 3.0, cropped and resized
10.0 mi · 4,500 ft · Very hard
Check access
This is the Mt. St. Helens hike most people mean: a forest trail, about 2,500 vertical feet of boulders, then a steep ash slope to the crater rim above the lava dome. Most climbers take 7 to 12 hours. You need a permit above 4,800 feet all year, and from May 15 to Oct. 31 only 110 climbers a day get one.
Ape Cave
Photo: Ape Cave Lava Tube by Greg Willis, CC BY-SA 2.0, resized
2.8 mi · 350 ft · Easy
Check access
Ape Cave is a 2.5-mile lava tube, and the easy lower cave is the best family outing near the mountain. The upper cave is a 2.5 to 3 hour loop with more than 20 boulder piles and an 8-foot lava wall to climb. Book a timed ticket on Recreation.gov, bring 2 light sources per person, and go before Oct. 31, when the cave closes until May 18.
Ape Canyon
Photo: Ape Canyon by jhvanwa, CC0, resized
11.0 mi · 1,400 ft · Hard
Check access
Ape Canyon is the long day for hikers who want open volcano views without a climbing permit. The trail climbs beside an old mudflow through old-growth fir, follows the rim of a narrow canyon and ends at the Loowit Trail near 4,200 feet. Mountain bikers use it heavily on weekends, dogs aren’t allowed, and the lot holds only about 7 cars.
Lewis River Falls
Photo: Lower Falls Lewis River by pfly, CC BY-SA 2.0, resized
8.8 mi · 450 ft · Moderate
Check access
Lewis River Falls is the pick for families with dogs or anyone who wants waterfalls more than volcano views. The trail passes Lower, Middle and Upper falls on a nearly flat route and ends at Taitnapum Falls, with turnaround points all along the way. The summer day-use reservation at Lower Falls ended Sept. 2, and vine maples color the river banks in fall.
East side: FR 99 and Spirit Lake
The east side is reached from US 12 at Randle on FR 25, then FR 99, a 16-mile road into the blast zone that ends at Windy Ridge. The Forest Service lists its season as July 1 to Nov. 30, and it opened for 2026 in June.
Harmony Trail to Spirit Lake
Photo: Mount St. Helens and Spirit Lake by Greg Willis, CC BY-SA 2.0, resized
2.4 mi · 650 ft · Easy
The Harmony Trail is the one hike on this page that reaches Spirit Lake’s shore, where logs toppled in 1980 still float in a mat. It drops about 650 feet in 1.2 miles, so all the work comes on the way back up. Swimming, fishing, pets and leaving the trail are prohibited.
Plains of Abraham
Photo: Plains of Abraham in WA by jhvanwa, CC0, resized
8.0 mi · 2,000 ft · Hard
Check access
The Plains of Abraham is a pumice flat on the volcano’s east flank, about 4 miles from Windy Ridge along a narrow blast-zone ridge with cable steps. The trails from Windy Ridge are closed Monday to Friday through Oct. 31, 2026, for the Spirit Lake project, and open on weekends and federal holidays. On a weekday, the Loowit Trail from Ape Canyon gets you there in about 14.6 miles roundtrip.
West side: SR 504 and Coldwater Lake
SR 504, the Spirit Lake Memorial Highway, climbs east from I-5 at Castle Rock toward the west side of the volcano. It has been closed past milepost 45.2 since a May 2023 landslide took out a bridge, and WSDOT expects to finish the rebuild in spring 2027.
Coldwater Lake
Photo: Coldwater Lake and Mount St. Helens by Chris Light, CC BY-SA 4.0, resized
9.0 mi · 550 ft · Moderate
Coldwater Lake formed when the 1980 eruption sent a debris avalanche down the North Fork Toutle River and dammed Coldwater Creek. The Lakes Trail follows the northwest shore 4.5 miles to the head of the lake, with little climbing. The lake sits at milepost 45 on SR 504, just below the gate, so you can hike here while Johnston Ridge is closed, with the road rebuild expected to finish in spring 2027. The trail usually melts out by mid-May.
Map of every Mount St. Helens hike on this page
All 7 Mount St. Helens hikes
The table lists all 7 with their access notes.
Show Hide the table of all 7 hikes
| Hike | Area | Miles | Gain | Difficulty | Drive from Seattle | Pass | Best months | Access |
|---|---|---|---|---|---|---|---|---|
| Ape Cave | Mount St. Helens | 2.8 | 350 ft | Easy | 3 hr 10 min | Northwest Forest Pass | May to Oct. | Check: Reservations are required through Oct. 31… details |
| Lewis River Falls | South Cascades and Mount Adams | 8.8 | 450 ft | Moderate | 3 hr 45 min | Northwest Forest Pass | April to Nov. | Check: Forest Road 90 is closed between the Road 9054 and Road 9055… details |
| Harmony Trail to Spirit Lake | Mount St. Helens | 2.4 | 650 ft | Easy | 3 hr 35 min | Northwest Forest Pass | July to Oct. | Open |
| Ape Canyon | Mount St. Helens | 11.0 | 1,400 ft | Hard | 3 hr 55 min | Northwest Forest Pass | July to Sept. | Check: The Forest Service says to expect delays or a closure… details |
| Mount St. Helens via Monitor Ridge | Mount St. Helens | 10.0 | 4,500 ft | Very hard | 3 hr 20 min | Northwest Forest Pass | July to Sept. | Check: Permits are capped at 110 a day through Oct. 31 details |
| Plains of Abraham | Mount St. Helens | 8.0 | 2,000 ft | Hard | 3 hr 40 min | Northwest Forest Pass | July to Oct. | Check: The Truman, Abraham and Windy trails are closed Monday… details |
| Coldwater Lake | Mount St. Helens | 9.0 | 550 ft | Moderate | 2 hr 50 min | Northwest Forest Pass | May to Nov. | Open |
The 3 sides of Mount St. Helens
Each side has its own road, its own season and different hikes, so pick one before you leave home. This table shows each road as of our last check.
| Road | Status | Note | Season | Checked | Source | Hikes |
|---|---|---|---|---|---|---|
| SR 504 to Johnston Ridge | Closed | DetailsWSDOT keeps SR 504 closed at milepost 45.2 while it rebuilds the road and bridge lost to the May 2023 South Coldwater slide, so Johnston Ridge can’t be reached by car, while Coldwater Lake below the gate stays open (WSDOT, September 2026).Season: WSDOT expects to finish the road in spring 2027, and Johnston Ridge Observatory needs power and other repairs after that before it can reopen. | WSDOT expects to finish the road in spring 2027, and Johnston Ridge Observatory needs power and other repairs after that before it can reopen. | WSDOT | 0 | |
| FS Roads 83 and 81 (Ape Cave to Climbers Bivouac) | Check | DetailsFR 83 has culvert work at milepost 2.26 from Sept. 14 to Oct. 30, 2026, and the forest doesn’t say which trailheads it affects, so expect delays or a closure on FR 83 past milepost 2.26 through Oct. 30, 2026 on the way to Ape Cave, Climbers Bivouac, June Lake, Ape Canyon and Lava Canyon (Gifford Pinchot National Forest, October 2026).Season: A Sno-Park permit is required at the winter Sno-Parks on these roads from Dec. 1 to March 30. | A Sno-Park permit is required at the winter Sno-Parks on these roads from Dec. 1 to March 30. | USFS | 3 | |
| Lewis River Road (FS 90) | Check | DetailsForest Road 90 is closed between the Road 9054 and Road 9055 intersections Oct. 19-31, 2026, and has sporadic closures between mileposts 19.4 and 45 through Oct. 31 for culvert work, so call the forest at 360-891-5000 before you drive (Gifford Pinchot National Forest road repairs page, Oct. 15, 2026).Season: Plowed to Pine Creek in winter; the rest of the road opens as snow melts in late spring and early summer. | Plowed to Pine Creek in winter; the rest of the road opens as snow melts in late spring and early summer. | USFS | 1 | |
| FS Road 99 to Windy Ridge | Open | Open for its season, which runs July 1 to Nov. 30 (Gifford Pinchot National Forest, September 2026). | Gated for winter; the Forest Service lists the season as July 1 to Nov. 30. | USFS | 2 |
West: SR 504 and Coldwater
SR 504, the Spirit Lake Memorial Highway, is the road to Johnston Ridge. It’s closed at milepost 45.2, so the stops you can still drive to are Elk Rock Viewpoint (milepost 37), the Science and Learning Center at Coldwater (milepost 43), Coldwater Lake and the Hummocks Trail. Coldwater Lake is the one hike on this page on the west side.
South: Cougar, FR 83 and FR 81
The south side holds Ape Cave, the Climbers Bivouac trailhead, the Trail of Two Forests boardwalk over 2,000-year-old lava and the Lahar Viewpoint, which the Forest Service calls the only clear road view of the mountain’s south side. FR 81 has several miles of rough gravel, and the Forest Service recommends AWD or 4WD on FR 81 and the 2.7-mile FR 830 spur to Climbers Bivouac.
From Dec. 1 to March 30, parking on the south side needs a Washington Sno-Park permit (Forest Service south side page).
East: FR 25, FR 99 and Windy Ridge
The Forest Service says the east side’s roads typically open from late June until November. FR 99 is narrow and rough, and trailers aren’t allowed; leave them at Wakepish Sno-Park. Sites along the road charge $5 per vehicle per day or take a recreation pass (Forest Road 99 page).
Through Oct. 30, 2027, the Spirit Lake tunnel project closes the Truman, Windy, Plains of Abraham and Harry’s Ridge trails and the FR 99 extension Monday through Friday from May 15 to Oct. 31. They open on weekends and federal holidays, and the Harmony Trail isn’t on the list.
SR 504 and Johnston Ridge Observatory status
On May 14, 2023, more than 300,000 cubic yards of debris slid down a hillside near milepost 49 and destroyed the 85-foot Spirit Lake Outlet Bridge. SR 504 has been gated at milepost 45.2, just past the Hummocks Trailhead, ever since, and Johnston Ridge Observatory can’t be reached by car.
WSDOT is building a new two-lane road and bridge. Construction started April 27, 2026, crews are setting the steel girders now, and work will pause for winter. The WSDOT project page, updated Sept. 14, 2026, expects construction to finish in spring 2027. After that, the Forest Service has to restore Johnston Ridge Observatory, including its power, before it can reopen.
Below the gate, the Coldwater Science and Learning Center, Coldwater Lake day use and the Hummocks Trail are open. The Forest Service closure notice says hikers can still reach Loowit Viewpoint and Johnston Ridge on foot via the Hummocks Trail and the Boundary Trail, and the South Coldwater Trail is open to walkers about 1 mile past the gate.
Mount St. Helens climbing permits
Anyone going above 4,800 feet on the mountain needs a climbing permit, all year. From April 1 to Oct. 31, permits cost $20 per climber per day plus a $6 reservation fee per transaction on Recreation.gov. The daily cap is 350 climbers from April 1 to May 14 and 110 from May 15 to Oct. 31.
Each month’s permits go on sale at 7 a.m. Pacific on the first day of the month before, so October permits opened Sept. 1. The permit holder must be 18 or older, groups max out at 12, and one person can hold up to 5 permits at a time. From Nov. 1 to March 31, permits are free and self-issued at the trailhead.
Climbers Bivouac, at 3,736 feet, opened for the 2026 season on May 22 and has vault toilets and tent pads; bring all your water. Entering the crater is prohibited, and the Forest Service asks climbers to stay at least 30 feet back from the rim, where snow cornices can overhang the edge. Carry 3 to 4 liters per person, and read our hiking safety basics before the climb.
Ape Cave rules and reservations
Ape Cave is open May 18 to Oct. 31, 9 a.m. to 5 p.m., and every visit in that window needs a timed ticket for a 2-hour slot on Recreation.gov, with a $2 fee, one per vehicle. Parking also needs a Northwest Forest Pass, an interagency pass or the $5 day fee. From Nov. 1 to May 17, the cave is closed to all entry (Ape Cave page).
A Forest Service order in effect from July 13, 2026 to July 12, 2028 bans fires and stoves, smoking, camping, alcohol, pets other than service animals and firing guns at the site, to slow the spread of white-nose syndrome in bats and protect the cave. Bring 2 light sources per person, since phone lights aren’t bright enough, and a warm layer for the steady 42°F. Lanterns are for rent at Ape Headquarters in season.
FAQ
Can you hike Mt. St. Helens?
Yes. The Monitor Ridge route climbs 4,500 feet in about 10 miles roundtrip to the 8,365-foot crater rim. You need a climbing permit above 4,800 feet all year: $20 plus a $6 fee from April 1 to Oct. 31, and free from Nov. 1 to March 31.
How long does it take to hike Mt. St. Helens?
Most climbers take 7 to 12 hours roundtrip, about 4.5 of them on the way up. Start at first light from Climbers Bivouac.
Can you hike into the Mt. St. Helens crater?
No. Entering the crater is prohibited. Stop at least 30 feet back from the rim at 8,365 feet, where you look down on the lava dome.
What is the best time to hike Mt. St. Helens?
July through September, when the summer route on Monitor Ridge is mostly free of snow. Earlier climbs cross long snowfields, and winter climbers use the Worm Flows route from Marble Mountain Sno-Park, which needs avalanche skills.
Is Johnston Ridge Observatory open?
No. SR 504 has been closed at milepost 45.2 since the May 2023 landslide, and WSDOT expects to finish the road in spring 2027, and the observatory needs power and other repairs after that before it can reopen.
Do you need a reservation for Ape Cave?
Yes, from May 18 to Oct. 31: a timed ticket on Recreation.gov with a $2 fee, one per vehicle. The cave is closed from Nov. 1 to May 17.







